Development of Procedures for Characterizing and Ranking Environmental and Other Risks
Development of Procedures for Characterizing and Ranking Environmental and Other Risks
批准号:
9512023
负责人:
M Granger Morgan
金额:
$45.5万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
1995
资助国家:
美国
项目状态:
已结题
起止时间:
1995-09-01 至 1999-08-31
中文摘要
私人投资机构建议开发一种对风险进行排序的方法工具。由于社会减少所有风险的能力有限,因此对必须面对的风险进行优先排序显然是有益的。待开发的工具将包括公众价值和专家评级,作为风险评估技术的组成部分。排序过程将包括对风险进行分类,并确定评估风险所依据的属性。每组评估员都将执行简化和印象排序程序,以尽量减少程序和框架效应对风险评估的影响。pi还将进行一系列研究,以帮助确定他们开发的程序是否会产生可重复的结果。
英文摘要
The PIs propose to develop a methodological tool for ranking risks. Since the society has a limited ability to reduce all risks, there is an obvious benefit in prioritizing the risks that must be confronted. The tool to be developed will include both public values and experts ratings as components of the risk assessment technique. The ranking process will involve categorization of the risks and identification of the attributes upon which the risks will be evaluated. Each group of assessors will both perform reductionistic and impressionistic ranking procedures in order to minimize the influence of procedural and framing effects on the assessment of risk. The PIs will also conduct a series of studies to help determine whether the procedure they develop will yield reproducible results.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
A Proposal for Annual Doctoral Student Participatory Workshops on Climate and Energy Decision Making
-
批准号:2013896
-
项目类别:Standard Grant
-
资助金额:$25.13万
-
财政年份:2020
-
负责人:M Granger Morgan
-
依托单位:
DMUU: Climate and Energy Decision Making
-
批准号:1463492
-
项目类别:Cooperative Agreement
-
资助金额:$450.0万
-
财政年份:2015
-
负责人:M Granger Morgan
-
依托单位:
DMUU: Center on Climate Decision Making
-
批准号:0949710
-
项目类别:Cooperative Agreement
-
资助金额:$599.71万
-
财政年份:2010
-
负责人:M Granger Morgan
-
依托单位:
DMUU: Climate and Related Decision Making in the Face of Irreducible Uncertainties
-
批准号:0345798
-
项目类别:Cooperative Agreement
-
资助金额:$140.0万
-
财政年份:2004
-
负责人:M Granger Morgan
-
依托单位:
The Use of Bounding Analysis in Risk Analysis
-
批准号:0216897
-
项目类别:Standard Grant
-
资助金额:$11.05万
-
财政年份:2002
-
负责人:M Granger Morgan
-
依托单位:
Continued Development of Methods for Characterizing and Ranking Health, Safety and Environmental Risks
-
批准号:9975200
-
项目类别:Standard Grant
-
资助金额:$19.07万
-
财政年份:1999
-
负责人:M Granger Morgan
-
依托单位:
Mathematical Sciences: Dealing with Mixed Levels of Uncertainty
-
批准号:9523602
-
项目类别:Standard Grant
-
资助金额:$24.06万
-
财政年份:1995
-
负责人:M Granger Morgan
-
依托单位:
Improving Expert Elicitation Through Studies of Climate Change and Its Possible Impacts
-
批准号:9209783
-
项目类别:Standard Grant
-
资助金额:$10.5万
-
财政年份:1992
-
负责人:M Granger Morgan
-
依托单位:
Integrated Studies of Problems in Managing Research and Human Responses to Global Climate Change
-
批准号:9022738
-
项目类别:Continuing Grant
-
资助金额:$35.0万
-
财政年份:1991
-
负责人:M Granger Morgan
-
依托单位:
Research on Improving Risk Management Through Improving Theory and Practice in Risk Perception and Risk Communication
-
批准号:8715564
-
项目类别:Continuing Grant
-
资助金额:$119.74万
-
财政年份:1987
-
负责人:M Granger Morgan
-
依托单位:
Empirical Design of User Interfaces (Information Science)
-
批准号:8514090
-
项目类别:Continuing Grant
-
资助金额:$38.68万
-
财政年份:1985
-
负责人:M Granger Morgan
-
依托单位:
Risk and Uncertainty
-
批准号:8413097
-
项目类别:Standard Grant
-
资助金额:$14.01万
-
财政年份:1984
-
负责人:M Granger Morgan
-
依托单位:
Experiments on Interactive Exploration and Modification of Data and Model Structures (Information Science)
-
批准号:8316890
-
项目类别:Continuing Grant
-
资助金额:$35.6万
-
财政年份:1983
-
负责人:M Granger Morgan
-
依托单位:
Experimental Analysis of Factors in the Design of Information Systems For Modelling Engineering/Economic Decisions
-
批准号:8112439
-
项目类别:Standard Grant
-
资助金额:$25.76万
-
财政年份:1981
-
负责人:M Granger Morgan
-
依托单位:
Technological Uncertainty in Policy Analysis: Techniques ForEstimating Health Impacts From Coal-Fired Power Plants
-
批准号:7913070
-
项目类别:Standard Grant
-
资助金额:$17.11万
-
财政年份:1979
-
负责人:M Granger Morgan
-
依托单位:
Substitution of Information Technologies For Energy Technologies
-
批准号:7623693
-
项目类别:Continuing Grant
-
资助金额:$23.09万
-
财政年份:1977
-
负责人:M Granger Morgan
-
依托单位:
海外基金